







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable Home Addition Contractor Across Marina del Rey
A home addition in Marina del Rey typically costs between $180 and $450 per square foot depending on scope, finishes, and whether you’re building a ground-floor bump-out or a full second story. You’ll also face a permitting layer most of Los Angeles never deals with: the Coastal Development Permit overlay, which applies to virtually every structural addition in Marina del Rey and can add two to five months to your timeline before a single wall goes up. That’s the real cost driver here, and most contractors won’t mention it until you’re already committed. We put it in writing on day one. Call (903) 568-7222 and we’ll walk you through exactly what your project needs, what it costs, and how long it’ll actually take.
We know Marina del Rey because we work here every week. Our crews drive the same streets you do, from the marina-side condos off Admiralty Way to the single-family pockets near Ballona Creek. Troy Eastman leads our Marina del Rey projects personally, and he’s the same person who answers when you call about a change order, a permit question, or a plan revision. No phone tag. No “the office will get back to you.” Just a straight answer.
Why Benson ADU Builders Is Marina del Rey’s Preferred Home Addition Contractor Company

Marina del Rey isn’t Santa Monica, and it isn’t Culver City. The coastal overlay changes everything about how additions get permitted, engineered, and built here. We’ve spent years navigating the LA County plan check process alongside the Coastal Commission’s discretionary review, which means we know what triggers a view corridor objection, when a geotechnical report becomes mandatory, and how to write plans that pass the first time instead of the third. That local knowledge isn’t something you can Google. It’s earned project by project.
Every Marina del Rey project starts with a written price before any work begins. Not a rough estimate, not a verbal ballpark, not a number that “might adjust after we open the walls.” A line-item price sheet you can review on your phone, sign electronically, and hold us to. If the scope changes, you approve that change in writing first. That’s our process, and it’s governed by The Relay Visibility Guarantee, the same framework that’s backed by the Relay Home Co. family, established 2006. We build with prefab brands like Cover, Dvele, and Boxabl when the project benefits from factory precision, and with James Hardie cladding when coastal moisture and salt air demand materials that won’t warp or rot.
Our technicians are background-checked and arrive in uniform. You’ll know exactly who’s walking onto your property, and you’ll have a live person on the phone 24/7 if something comes up after hours. On a marina-side project, that matters more than you’d think. Coastal conditions create surprises. We’re built to handle them without drama.
Sunroom Addition in Marina del Rey
A sunroom addition in Marina del Rey runs between $35,000 and $90,000 depending on whether you’re building a three-season room with basic glazing or a conditioned four-season space with insulated glass and HVAC tie-in. The salt air off the marina is the quiet killer here: aluminum frames corrode fast, untreated lumber swells, and cheap sealants fail within two seasons. That’s why we spec marine-grade hardware and composite decking on sunrooms in the Oxford Triangle and Silver Strand neighborhoods, where morning fog and afternoon sun cycle materials through harsh extremes.
What the build actually involves
A typical Marina del Rey sunroom starts with a concrete pad or pier foundation engineered to handle the area’s silty, near-shore soils. From there, it’s framed, glazed, flashed, and finished. We coordinate the Coastal Development Permit if your property sits within the coastal zone overlay, which most Marina del Rey parcels do. The permit isn’t optional, but we handle it so you don’t have to.
What you can expect to spend
The range above covers standard build-out: permits, foundation, framing, glazing, electrical, and finish work. If you’re adding on to a condo or a home within a marina-side complex, expect HOA design review to add $500 to $1,500 in application and revision fees and roughly two to six weeks to the schedule. We’ll tell you that on the first call, not after your deposit clears.
Second Story Addition Contractor in Marina del Rey

A second story addition contractor in Marina del Rey faces one problem most other LA neighborhoods never see: the near-shore liquefaction zone. Marina del Rey’s soil is unconsolidated fill and marine sediment over the old Ballona wetlands, and when the city engineer reviews a second-story addition, they’ll almost always require a geotechnical report before approving structural plans. A second-story addition here runs $250,000 to $450,000 for a typical 600 to 1,000 square foot build-out, with engineering and Coastal Development Permit work adding $15,000 to $40,000 on top.
Why the coastal overlay changes everything
On a second-story addition in Marina del Rey, the Coastal Commission reviews your height, setbacks, and roofline before LA County will even schedule a plan check. If your new second floor would block a neighbor’s protected view corridor along Via Marina or Pacific Avenue, the commission will push back. We design around that from the first set of plans, not after a denial letter arrives.
Foundation work you can’t skip
Second-story additions here typically require underpinning or supplemental footings because the existing foundation wasn’t engineered for the added load. That’s where the geotechnical report matters: it tells us whether we’re dealing with competent soil or the kind of loose fill that needs deep piers. Skipping this step saves money for about three months, until the inspector flags the plans and everything stops. We don’t skip it.
Trusted Brands We Service in Marina del Rey
We’re authorized to build with Cover, Dvele, and Boxabl, three prefab brands that handle coastal conditions better than traditional stick-framing in several key ways. Prefab panels arrive on site with tighter tolerances, less moisture exposure during construction, and factory-controlled sealing that holds up against Marina del Rey’s salt-laden air. We also stock James Hardie fiber cement siding for our Marina del Rey customers because it doesn’t warp or swell the way wood lap siding does after ten years of ocean fog. When you work with us, you’re not locked into one product. You get options you can research yourself, and we’ll walk you through what each one costs in your specific situation.
Common Home Addition Contractor Problems We See in Marina del Rey Homes
- Coastal Development Permit surprises: Homeowners assume a standard LA City building permit covers their addition, then discover mid-planning that the Coastal Act requires a separate discretionary review with public notice. That discovery usually happens three months into the process, and it resets the clock.
- Geotechnical report gaps on second stories: Marina del Rey’s near-shore soils sit in a mapped liquefaction zone, which means second-story additions almost always require a geotech report before structural approval. Skipping it leads to mid-construction foundation redesigns that can cost $20,000 or more and stop work for weeks.
- HOA design review rejections: Many Marina del Rey homes sit within condo or HOA communities that have their own architectural review process, especially along the marina-side complexes off Admiralty Way. Their design committee can reject rooflines and materials independently of the coastal review, which means two layers of approval to clear instead of one.
- Coastal moisture damage to standard materials: We regularly see additions built with inland-grade lumber and standard flashing that fail within five years. The salt air and persistent morning fog along Ballona Creek and the Oxford Triangle accelerate rot and corrosion well beyond what typical LA housing stock experiences.
Pricing for Home Addition Contractor in Marina del Rey, CA
Here are the ranges we quote most often in Marina del Rey. A room addition or bump-out for a bedroom or home office runs $80,000 to $180,000. A sunroom addition lands between $35,000 and $90,000 depending on glazing and HVAC scope. A second-story addition is the biggest line item: $250,000 to $450,000 for a typical 600-1,000 square foot build, including foundation work and engineering. Coastal Development Permit processing and geotechnical reports add $15,000 to $40,000 on larger projects, and HOA review fees can add another $500 to $1,500 if you’re in a managed complex. Every estimate from us is free, and it’s in writing before you sign anything. Call (903) 568-7222 and we’ll put numbers on your exact project this week.
We Also Serve Cities Near Marina del Rey
Our crews work across the Westside, which means we’re already in your neighborhood. If you’re just outside Marina del Rey in Venice, Culver City, Santa Monica, or El Segundo, the same team and the same written-price guarantee apply. We coordinate with each city’s planning desk and handle the permit layers, whether you’re building near the beach or inland. For more on how we approach additions across the region, visit our Home Addition Contractor page, and for a closer look at this specific area, see our Home Addition Contractor in Marina del Rey guide.
Serving Marina del Rey, CA - Our Local Coverage Area
We’re based in the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Home Addition Contractor in Marina del Rey
Yes, almost always. Marina del Rey sits almost entirely within the California Coastal Zone, which means a standard LA City building permit isn’t enough for structural additions. You’ll need a Coastal Development Permit, which adds discretionary review, public notice, and typically two to five months to your timeline. Call (903) 568-7222 and we’ll tell you in one call whether your specific address triggers the overlay, before you spend any money on plans.
Plan on six to twelve months from plan submission to pulling permits. The Coastal Development Permit adds the most time: the commission’s review runs on its own calendar, and public notice periods can’t be shortened. After coastal approval, LA County plan check typically takes six to ten weeks, and a geotechnical report adds two to four weeks if one isn’t already on file. We’ll give you a realistic schedule for your specific address when you call.
Two things: the coastal view corridor rules and the liquefaction zone. The Coastal Commission reviews height and roofline against protected view corridors along the marina and ocean side, which can force design changes you wouldn’t face in Culver City. And the near-shore soils trigger geotechnical reports that inland builders rarely need. Both add cost and time, and both are non-negotiable. Call (903) 568-7222 for a free estimate that accounts for them up front.
In most cases, yes, but not always. A small sunroom on a concrete pad with pier footings may avoid a deep foundation, but the Coastal Development Permit still applies, and the soil conditions near Ballona Creek can require additional compaction testing. We’ll scope your specific lot before you commit to designs, and we’ll tell you in writing whether a full foundation is required.
Only two things: you change the scope, or the city or Coastal Commission requires a design revision we didn’t anticipate. The first is in your control, and the second is why we front-load coastal and geotech review before we open any walls. If a covered repair fails within 365 days of completion, our Done Right Promise means we fix it without a second invoice. Our written price locks in the rest. Call (903) 568-7222 and we’ll put the full breakdown in writing for your project.
Written by Troy Eastman, Owner at Benson ADU Builders, serving Marina del Rey through our Los Angeles office.


